Triple

T3792737
Position Surface form Disambiguated ID Type / Status
Subject Blagoveshchensky Bridge E89695 entity
Predicate instanceOf P0 FINISHED
Object tram bridge C14305 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tram bridge
Context triple: [Blagoveshchensky Bridge, instanceOf, tram bridge]
  • A. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • B. ornamental bridge
    An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
  • C. canal bridge
    A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
  • D. iron bridge
    An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
  • E. truss bridge
    A truss bridge is a type of bridge whose load-bearing superstructure is composed of a framework of interconnected triangular units that efficiently distribute forces through tension and compression.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9597d6881909b6ee3b9de859223 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:15 p.m.