Triple
T3782625
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | exo (Réseau de transport métropolitain) |
E85454
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | regional transport agency |
C220
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: regional transport agency Context triple: [exo (Réseau de transport métropolitain), instanceOf, regional transport agency]
-
A.
public transportation agency
chosen
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
B.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
C.
regional planning agency
A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
-
D.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
E.
transport infrastructure operator
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed937fa8881908208ef3801060826 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:13 p.m.