Triple

T37820189
Position Surface form Disambiguated ID Type / Status
Subject The Nose E942889 entity
Predicate instanceOf P0 FINISHED
Object big-wall climbing route C6568 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: big-wall climbing route
Context triple: [The Nose, instanceOf, big-wall climbing route]
  • A. big wall rock climbing route chosen
    A big wall rock climbing route is a long, multi-pitch climb on a large cliff or rock face that typically requires advanced skills, significant time (often more than a day), and specialized gear for ascending, hauling, and sometimes overnight bivouacs.
  • B. rock climbing route
    A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
  • C. ice climbing route
    An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
  • D. ridge climb route
    A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
  • E. big wall climbing record
    A big wall climbing record is an achievement documenting the fastest, most difficult, or otherwise notable ascent of a large, multi-pitch rock face, typically measured by time, style, or route difficulty.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ee987588190906506e759be5db3 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.