Triple

T3780126
Position Surface form Disambiguated ID Type / Status
Subject Sabarmati Riverfront E85396 entity
Predicate instanceOf P0 FINISHED
Object riverfront development project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: riverfront development project
Context triple: [Sabarmati Riverfront, instanceOf, riverfront development project]
  • A. waterfront revitalization plan
    A waterfront revitalization plan is a comprehensive strategy to transform underused or deteriorated shoreline areas into vibrant, accessible, and sustainable public and economic spaces.
  • B. waterfront district
    A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
  • C. waterfront pier complex
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • D. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • E. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed937fa8881908208ef3801060826 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:12 p.m.