Triple

T37789403
Position Surface form Disambiguated ID Type / Status
Subject CSRS Offset E942039 entity
Predicate instanceOf P0 FINISHED
Object hybrid retirement system C7279 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hybrid retirement system
Context triple: [CSRS Offset, instanceOf, hybrid retirement system]
  • A. pension plan chosen
    A pension plan is a long-term savings and investment arrangement, typically sponsored by an employer or government, that provides individuals with regular income payments after retirement based on contributions and plan rules.
  • B. hybrid work
    Hybrid work is a flexible employment model in which employees split their time between remote locations and a central workplace, balancing in-person collaboration with the autonomy of working from anywhere.
  • C. multiemployer benefit plan
    A multiemployer benefit plan is a collectively bargained employee benefit arrangement maintained by two or more unrelated employers, typically within the same industry, and administered by a joint board of trustees representing both employers and labor unions.
  • D. CalPERS facility
    A CalPERS facility is a physical or virtual location operated or designated by the California Public Employees’ Retirement System to support its administrative, investment, member service, or operational activities.
  • E. hybrid energy recovery system
    A hybrid energy recovery system is an integrated setup that captures, stores, and reuses waste energy from multiple sources (such as mechanical, thermal, and electrical) to improve overall efficiency and reduce primary energy consumption.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ee5cb0c81909a363d1c929156c0 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.