Triple

T37761465
Position Surface form Disambiguated ID Type / Status
Subject Maria José of Savoy E941284 entity
Predicate endTime (reign as queen consort of Italy) P22338 FINISHED
Object 1946-06-12 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1946-06-12 | Statement: [Maria José of Savoy, endTime (reign as queen consort of Italy), 1946-06-12]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endTime (reign as queen consort of Italy)
Context triple: [Maria José of Savoy, endTime (reign as queen consort of Italy), 1946-06-12]
  • A. endTimeAsQueenConsort chosen
    Indicates the date and time at which an individual’s tenure as queen consort comes to an end.
  • B. start time (Queen consort of Sardinia)
    Indicates the point in time when an individual began holding the position of Queen consort of Sardinia.
  • C. reignAsQueenConsortOfNaplesEnd
    Indicates the time or event at which an individual’s tenure as queen consort of Naples comes to an end.
  • D. endTime (Grand Duke of Tuscany)
    Indicates the point in time at which the tenure or reign of the Grand Duke of Tuscany comes to an end.
  • E. endTime (as Duchess of Brittany)
    Indicates the time at which the person’s tenure or role as Duchess of Brittany came to an end.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ee3251881909bb4451aad50752b completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69ff0b6bc4a88190bf1d38c6ea26bcdc completed May 9, 2026, 10:24 a.m.
PD Predicate disambiguation batch_69ff082a22f4819095ded971dbd8ea7b completed May 9, 2026, 10:10 a.m.
Created at: May 3, 2026, 4:19 p.m.