Triple
T3775301
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization |
E83292
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | preparatory commission |
C6550
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: preparatory commission Context triple: [Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization, instanceOf, preparatory commission]
-
A.
organizational committee
chosen
An organizational committee is a structured group of individuals formally appointed within an organization to plan, coordinate, and oversee specific functions, projects, or decision-making processes.
-
B.
selection committee
A selection committee is a group of individuals formally tasked with evaluating candidates or proposals against defined criteria to choose the most suitable options.
-
C.
public utilities commission
A public utilities commission is a government regulatory body that oversees and sets standards, rates, and practices for essential public services such as electricity, gas, water, and telecommunications to protect consumers and ensure reliable, fair service.
-
D.
provisional legislative body
A provisional legislative body is a temporary lawmaking assembly established to exercise legislative authority during a transitional or interim period before a permanent government structure is formed or restored.
-
E.
coup committee
A coup committee is a small, often clandestine group of military, political, or security elites that plans, coordinates, and directs the overthrow of an existing government.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b235e608190b5a2b1d1bfcef50b |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3:36 p.m.