Triple

T3771256
Position Surface form Disambiguated ID Type / Status
Subject Walt Disney World water transportation E83202 entity
Predicate instanceOf P0 FINISHED
Object water transportation network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water transportation network
Context triple: [Walt Disney World water transportation, instanceOf, water transportation network]
  • A. waterway network
    A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
  • B. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • C. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • D. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • E. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b235e608190b5a2b1d1bfcef50b completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:36 p.m.