Triple
T3767237
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Title XII – Electricity |
E82707
|
entity |
| Predicate | assignsOversightTo |
P20679
|
FINISHED |
| Object | Federal Energy Regulatory Commission |
E82708
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Federal Energy Regulatory Commission | Statement: [Title XII – Electricity, assignsOversightTo, Federal Energy Regulatory Commission]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Federal Energy Regulatory Commission Context triple: [Title XII – Electricity, assignsOversightTo, Federal Energy Regulatory Commission]
-
A.
Federal Energy Regulatory Commission
chosen
The Federal Energy Regulatory Commission is an independent U.S. government agency that regulates the interstate transmission of electricity, natural gas, and oil, and oversees wholesale energy markets and related infrastructure.
-
B.
Federal Energy Administration
The Federal Energy Administration was a short-lived U.S. government agency created in the 1970s to manage national energy policy and respond to energy crises before its functions were absorbed into the Department of Energy.
-
C.
Federal Power Commission
The Federal Power Commission was an independent U.S. regulatory agency responsible for overseeing interstate electricity and natural gas markets before its functions were eventually transferred to successor agencies such as the Department of Energy and the Federal Energy Regulatory Commission.
-
D.
North American Electric Reliability Corporation
The North American Electric Reliability Corporation (NERC) is a nonprofit regulatory authority responsible for developing and enforcing reliability standards for the bulk power system across North America.
-
E.
U.S. Nuclear Regulatory Commission
The U.S. Nuclear Regulatory Commission is the federal agency responsible for overseeing and ensuring the safe use of nuclear materials and facilities in the United States.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: assignsOversightTo Context triple: [Title XII – Electricity, assignsOversightTo, Federal Energy Regulatory Commission]
-
A.
assignedUnder
Indicates that one entity has been given responsibility, duty, or authority to act within the scope, supervision, or framework defined by another entity.
-
B.
assignsRoleTo
Indicates that one entity designates or grants a specific role or position to another entity.
-
C.
assignedTo
Indicates that responsibility for a task, item, or role has been designated to a specific entity.
-
D.
hasAssigningAuthority
Indicates that one entity serves as the official source or authority responsible for assigning or issuing identifiers, codes, or designations to another entity.
-
E.
oversee
chosen
Indicates having responsibility for supervising, directing, or managing the actions or work of another entity.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b207b0081909d2b48843fbd8795 |
completed | March 8, 2026, 2:43 p.m. |
| NER | Named-entity recognition | batch_69adcc2bdf6c819088d3c6ace83ca5ea |
completed | March 8, 2026, 7:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b51214d77881909a11857a8b8481f9 |
completed | March 14, 2026, 7:45 a.m. |
| PD | Predicate disambiguation | batch_69adc04ec36c8190bd5b944d4f4d32aa |
completed | March 8, 2026, 6:30 p.m. |
Created at: March 8, 2026, 3:35 p.m.