Triple
T37646
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | One World Trade Center |
E745
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | supertall skyscraper |
C240
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: supertall skyscraper Context triple: [One World Trade Center, instanceOf, supertall skyscraper]
-
A.
building
chosen
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
B.
office building complex
An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
-
C.
obelisk
An obelisk is a tall, four-sided, narrow tapering monument that ends in a pyramid-shaped top, typically carved from a single stone and often erected as a commemorative or ceremonial structure.
-
D.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
E.
building complex
A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a247a8f6c08190bac804906d62ed5a |
completed | Feb. 28, 2026, 1:40 a.m. |
Created at: Feb. 28, 2026, 1:46 a.m.