Triple

T37622676
Position Surface form Disambiguated ID Type / Status
Subject John J. Carty E936112 entity
Predicate instanceOf P0 FINISHED
Object American telephone engineer C21087 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: American telephone engineer
Context triple: [John J. Carty, instanceOf, American telephone engineer]
  • A. telecommunications pioneer chosen
    A telecommunications pioneer is an individual or organization that significantly advances the development, innovation, or deployment of communication technologies and networks, fundamentally transforming how information is transmitted and received.
  • B. French-American engineer
    A French-American engineer is a professional with dual French and American cultural or national backgrounds who applies engineering principles to design, analyze, and improve systems, structures, or technologies.
  • C. Canadian engineer
    A Canadian engineer is a professional trained in engineering disciplines who applies scientific and technical knowledge to design, develop, and maintain systems, structures, or technologies within the context of Canadian standards, regulations, and societal needs.
  • D. British engineer
    A British engineer is a professional from the United Kingdom who applies scientific and mathematical principles to design, develop, and maintain technological systems, structures, and processes across various engineering disciplines.
  • E. telecommunications entrepreneur
    A telecommunications entrepreneur is an individual who identifies opportunities and builds businesses that develop, provide, or innovate communication networks, services, or technologies connecting people and organizations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed16b748190ad6add183b1be688 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:18 p.m.