Triple

T37574704
Position Surface form Disambiguated ID Type / Status
Subject Goldfields Water Supply Scheme E934786 entity
Predicate instanceOf P0 FINISHED
Object water supply scheme C3665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water supply scheme
Context triple: [Goldfields Water Supply Scheme, instanceOf, water supply scheme]
  • A. water supply system chosen
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • B. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • C. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • D. water supply dam
    A water supply dam is a barrier constructed across a watercourse to store and regulate water primarily for human consumption, irrigation, and other municipal or industrial uses.
  • E. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ecd99148190be327e391a70f5b6 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:17 p.m.