Triple
T3747594
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rolls-Royce LiftSystem |
E81244
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | vertical lift system |
C5027
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: vertical lift system Context triple: [Rolls-Royce LiftSystem, instanceOf, vertical lift system]
-
A.
elevator
chosen
An elevator is a vertically moving transport device within a building that carries people or goods between different floors using a guided platform and mechanical lifting system.
-
B.
vertical-lift bridge
A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
-
C.
people mover system
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
D.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
E.
aerial lift
An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b19b7b08190a6188804e99c53e9 |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3:35 p.m.