Triple

T37440435
Position Surface form Disambiguated ID Type / Status
Subject E80 motorway E930402 entity
Predicate instanceOf P0 FINISHED
Object trans-European route C49884 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: trans-European route
Context triple: [E80 motorway, instanceOf, trans-European route]
  • A. trans-European transport network route chosen
    A trans-European transport network route is a designated corridor within the EU-wide integrated transport system that connects key cities, ports, and regions across Europe to facilitate efficient, interoperable, and sustainable cross-border movement of people and goods.
  • B. trans-European road
    A trans-European road is a major transportation route that crosses multiple European countries, facilitating international travel and trade across the continent.
  • C. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • D. Polish expressway
    A Polish expressway is a high-capacity, limited-access road in Poland designed for fast regional and intercity traffic, typically featuring dual carriageways, grade-separated junctions, and controlled entry and exit points.
  • E. transalpine trade route
    A transalpine trade route is a transportation corridor that crosses the Alps to facilitate the movement of goods, people, and cultural exchange between regions on either side of the mountain range.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ebfdcb8819098562ff3db673b04 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:17 p.m.