Triple

T3742630
Position Surface form Disambiguated ID Type / Status
Subject Nativitas embarcadero E79737 entity
Predicate instanceOf P0 FINISHED
Object boat-launching pier C8079 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: boat-launching pier
Context triple: [Nativitas embarcadero, instanceOf, boat-launching pier]
  • A. waterfront pier complex
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • B. boathouse chosen
    A boathouse is a waterside structure designed for storing, sheltering, and maintaining boats and related equipment, often providing direct access to a lake, river, or sea.
  • C. seaplane base
    A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
  • D. fishing port
    A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
  • E. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b115610819095b02007da5ca3cb completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 3:34 p.m.