Triple
T37415294
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rosewood Mausoleum |
E929687
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | above-ground burial structure |
C1066
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: above-ground burial structure Context triple: [Rosewood Mausoleum, instanceOf, above-ground burial structure]
-
A.
Funerary structure
A funerary structure is a built form or monument specifically designed to house, mark, or commemorate the dead and associated burial practices.
-
B.
historic communal burial structure
A historic communal burial structure is an enduring, often monumental edifice or site designed to inter and memorialize the dead of a community or group across generations.
-
C.
burial monument
chosen
A burial monument is a constructed marker or structure, such as a tomb, gravestone, or mausoleum, that commemorates and identifies the resting place of the dead.
-
D.
archaeological mound
An archaeological mound is an artificial or modified natural elevation of earth, stone, or debris created by past human activity, often containing buried cultural materials and serving as a key source of information about ancient societies.
-
E.
prehistoric underground burial complex
A prehistoric underground burial complex is a network of subterranean chambers and passages constructed by ancient societies to inter the dead, often accompanied by ritual artifacts and symbolic architecture.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ebde49481908566cd96b37ccc84 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.