Triple

T3739972
Position Surface form Disambiguated ID Type / Status
Subject PLC (Power Line Communication) E79674 entity
Predicate reusesInfrastructure P44581 FINISHED
Object existing power distribution wiring LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: existing power distribution wiring | Statement: [PLC (Power Line Communication), reusesInfrastructure, existing power distribution wiring]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reusesInfrastructure
Context triple: [PLC (Power Line Communication), reusesInfrastructure, existing power distribution wiring]
  • A. infrastructureReuse chosen
    Indicates that existing infrastructure is being used again for a new or continued purpose instead of building or deploying entirely new infrastructure.
  • B. usesInfrastructure
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • C. parallelInfrastructure
    Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
  • D. reusability
    Indicates that an entity can be used multiple times or in multiple contexts without significant modification or degradation of function.
  • E. supportsInfrastructure
    Indicates that one entity provides resources, services, or capabilities that enable the operation, maintenance, or development of another entity’s infrastructure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b115610819095b02007da5ca3cb completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69adcb5344fc8190b183aca5c04e3bcc completed March 8, 2026, 7:17 p.m.
PD Predicate disambiguation batch_69adc048f28c819092bed16a95a3cac1 completed March 8, 2026, 6:30 p.m.
Created at: March 8, 2026, 3:34 p.m.