Triple
T37388722
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 广州国际金融城(规划) |
E928643
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 城市金融商务区规划项目 |
C6939
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 城市金融商务区规划项目 Context triple: [广州国际金融城(规划), instanceOf, 城市金融商务区规划项目]
-
A.
商业综合体
商业综合体是集购物、餐饮、办公、娱乐、休闲及配套服务等多种功能于一体的大型城市建筑或建筑群。
-
B.
planned commercial district
A planned commercial district is a deliberately designed area designated for concentrated business, retail, and service activities, typically guided by zoning regulations and urban planning principles to support economic activity and accessibility.
-
C.
urban design project
chosen
An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
-
D.
commercial building projects
Commercial building projects are organized efforts to plan, design, finance, construct, and deliver structures intended primarily for business, retail, office, or other non-residential commercial uses.
-
E.
town center project
A town center project is a planned development initiative that creates or revitalizes a community’s central area by integrating mixed-use buildings, public spaces, and infrastructure to support social, economic, and cultural activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ebb10c481909b54b9dba263e29f |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.