Triple

T37388722
Position Surface form Disambiguated ID Type / Status
Subject 广州国际金融城(规划) E928643 entity
Predicate instanceOf P0 FINISHED
Object 城市金融商务区规划项目 C6939 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 城市金融商务区规划项目
Context triple: [广州国际金融城(规划), instanceOf, 城市金融商务区规划项目]
  • A. 商业综合体
    商业综合体是集购物、餐饮、办公、娱乐、休闲及配套服务等多种功能于一体的大型城市建筑或建筑群。
  • B. planned commercial district
    A planned commercial district is a deliberately designed area designated for concentrated business, retail, and service activities, typically guided by zoning regulations and urban planning principles to support economic activity and accessibility.
  • C. urban design project chosen
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • D. commercial building projects
    Commercial building projects are organized efforts to plan, design, finance, construct, and deliver structures intended primarily for business, retail, office, or other non-residential commercial uses.
  • E. town center project
    A town center project is a planned development initiative that creates or revitalizes a community’s central area by integrating mixed-use buildings, public spaces, and infrastructure to support social, economic, and cultural activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ebb10c481909b54b9dba263e29f completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:16 p.m.