Triple

T3738447
Position Surface form Disambiguated ID Type / Status
Subject RBS 70 E79641 entity
Predicate hasVariant P455 FINISHED
Object RBS 70 NG E79641 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RBS 70 NG | Statement: [RBS 70, hasVariant, RBS 70 NG]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RBS 70 NG
Context triple: [RBS 70, hasVariant, RBS 70 NG]
  • A. RBS 70 missile system chosen
    The RBS 70 missile system is a Swedish man-portable, laser-guided short-range air defense system designed to engage low-flying aircraft and helicopters.
  • B. RBS 56 BILL anti-tank missile
    The RBS 56 BILL is a Swedish-made, wire-guided, top-attack anti-tank missile system designed to defeat armored vehicles by striking their thinner upper armor.
  • C. Regal RPX
    Regal RPX is a premium large-format movie auditorium brand from Regal Cinemas, featuring oversized screens, enhanced sound systems, and upgraded seating for an immersive theater experience.
  • D. R5 Paoli
    R5 Paoli was the former designation for a commuter rail service segment on SEPTA’s Paoli/Thorndale Line in the Philadelphia area.
  • E. R-5
    The R-5 is an early Sikorsky military helicopter developed during World War II, known for advancing rotary-wing design and serving in roles such as rescue and liaison.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b115610819095b02007da5ca3cb completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69adcb3e9248819098d481fe29e1c628 completed March 8, 2026, 7:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4db20bdfc81909cd27278ff5d9716 completed March 14, 2026, 3:50 a.m.
Created at: March 8, 2026, 3:34 p.m.