Triple

T3738111
Position Surface form Disambiguated ID Type / Status
Subject Spring Hill Assembly Plant E79633 entity
Predicate partOf P40 FINISHED
Object General Motors North America manufacturing network E80432 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: General Motors North America manufacturing network | Statement: [Spring Hill Assembly Plant, partOf, General Motors North America manufacturing network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: General Motors North America manufacturing network
Context triple: [Spring Hill Assembly Plant, partOf, General Motors North America manufacturing network]
  • A. General Motors North American manufacturing network chosen
    The General Motors North American manufacturing network is the integrated system of GM vehicle and component plants across North America that coordinates production, assembly, and distribution of the company’s automotive products.
  • B. General Motors global manufacturing system
    General Motors global manufacturing system is the company’s integrated, standardized framework for designing, operating, and continuously improving its vehicle production plants worldwide.
  • C. General Motors global engineering network
    The General Motors global engineering network is the worldwide system of GM’s research, development, and engineering facilities that collaboratively design and refine the company’s vehicles and technologies.
  • D. General Motors Technical Center
    The General Motors Technical Center is a landmark mid-20th-century corporate research and design campus in Warren, Michigan, celebrated as a masterpiece of modernist architecture and planning.
  • E. General Motors Flint Assembly Plant
    General Motors Flint Assembly Plant is a major automotive manufacturing facility in Flint, Michigan, historically known for producing a wide range of GM vehicles and playing a central role in the city’s industrial economy.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b115610819095b02007da5ca3cb completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69adcb3e9248819098d481fe29e1c628 completed March 8, 2026, 7:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4db20bdfc81909cd27278ff5d9716 completed March 14, 2026, 3:50 a.m.
Created at: March 8, 2026, 3:34 p.m.