Triple
T37335037
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barcelona Metro line L6 |
E926867
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Ferrocarrils de la Generalitat de Catalunya line |
C3787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Ferrocarrils de la Generalitat de Catalunya line Context triple: [Barcelona Metro line L6, instanceOf, Ferrocarrils de la Generalitat de Catalunya line]
-
A.
Cercanías network
A Cercanías network is a suburban and regional commuter rail system that connects a metropolitan city center with its surrounding towns and suburbs through frequent, short- to medium-distance train services.
-
B.
railway in Spain
A railway in Spain is a transportation infrastructure system consisting of tracks, stations, signaling, and rolling stock that facilitates passenger and freight train services across Spanish territory.
-
C.
Barcelona Metro rolling stock
Barcelona Metro rolling stock comprises the diverse fleet of electric multiple units and related rail vehicles used to operate passenger services across the Barcelona Metro network.
-
D.
railway line
chosen
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
E.
Medellín Metro line
A Medellín Metro line is a fixed public transit route within the Medellín Metro system, consisting of a sequence of stations and track segments that provide rapid, high-capacity rail service across specific urban and metropolitan corridors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eb4e8a881908bd40da28f36fc7e |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.