Triple

T37335037
Position Surface form Disambiguated ID Type / Status
Subject Barcelona Metro line L6 E926867 entity
Predicate instanceOf P0 FINISHED
Object Ferrocarrils de la Generalitat de Catalunya line C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Ferrocarrils de la Generalitat de Catalunya line
Context triple: [Barcelona Metro line L6, instanceOf, Ferrocarrils de la Generalitat de Catalunya line]
  • A. Cercanías network
    A Cercanías network is a suburban and regional commuter rail system that connects a metropolitan city center with its surrounding towns and suburbs through frequent, short- to medium-distance train services.
  • B. railway in Spain
    A railway in Spain is a transportation infrastructure system consisting of tracks, stations, signaling, and rolling stock that facilitates passenger and freight train services across Spanish territory.
  • C. Barcelona Metro rolling stock
    Barcelona Metro rolling stock comprises the diverse fleet of electric multiple units and related rail vehicles used to operate passenger services across the Barcelona Metro network.
  • D. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • E. Medellín Metro line
    A Medellín Metro line is a fixed public transit route within the Medellín Metro system, consisting of a sequence of stations and track segments that provide rapid, high-capacity rail service across specific urban and metropolitan corridors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eb4e8a881908bd40da28f36fc7e completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:16 p.m.