Triple
T3729947
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Traboules of Lyon |
E79037
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban passageway network |
C12185
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban passageway network Context triple: [Traboules of Lyon, instanceOf, urban passageway network]
-
A.
pedestrian network
chosen
A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
-
B.
urban street grid
An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
-
C.
road network
A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
-
D.
city network
A city network is an interconnected system of urban areas linked by transportation, communication, and economic relationships that facilitate the flow of people, goods, information, and services.
-
E.
urban arterial road
An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b0e4650819090ad7cef094285e8 |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3:34 p.m.