Triple
T3728301
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Calea Victoriei |
E79001
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | street in Bucharest |
C1088
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: street in Bucharest Context triple: [Calea Victoriei, instanceOf, street in Bucharest]
-
A.
ancient Roman street
An ancient Roman street is a paved public thoroughfare, typically constructed of stone blocks with raised sidewalks, drainage systems, and often lined with shops, houses, and public buildings, facilitating movement, trade, and social interaction within Roman cities.
-
B.
street
chosen
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
C.
shopping street
A shopping street is a public thoroughfare lined with a variety of retail stores, services, and eateries designed for pedestrian access and commercial activity.
-
D.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
E.
urban street grid
An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b0e4650819090ad7cef094285e8 |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3:34 p.m.