Triple

T37184500
Position Surface form Disambiguated ID Type / Status
Subject Villa San Giovanni ferry terminal E921286 entity
Predicate connectedToInfrastructure P43089 FINISHED
Object A2 motorway
The A2 motorway is a major Italian highway running through the south of the country, forming a key part of the national road network and linking Calabria with the rest of Italy.
E1711640 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A2 motorway | Statement: [Villa San Giovanni ferry terminal, connectedToInfrastructure, A2 motorway]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: A2 motorway
Triple: [Villa San Giovanni ferry terminal, connectedToInfrastructure, A2 motorway]
Generated description
The A2 motorway is a major Italian highway running through the south of the country, forming a key part of the national road network and linking Calabria with the rest of Italy.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ea250bc819083f28d81de25cd0c completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fb36166d4c8190a58c6050ff4ba490 completed May 6, 2026, 12:37 p.m.
NED1 Entity disambiguation (via context triple) batch_6a460a45fe188190b9317542d78e76e8 completed July 2, 2026, 6:50 a.m.
NEDg Description generation batch_6a460b4247548190a5a415c3e5e2c8a8 completed July 2, 2026, 6:54 a.m.
NED2 Entity disambiguation (via description) batch_6a460bb5d4d48190961b690ad460fcf4 completed July 2, 2026, 6:56 a.m.
Created at: May 3, 2026, 4:15 p.m.