Triple
T3716799
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metro Board |
E81550
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transit agency board |
C14167
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transit agency board Context triple: [Metro Board, instanceOf, transit agency board]
-
A.
public transportation agency
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
B.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
C.
public transit safety oversight agency
A public transit safety oversight agency is a governmental or quasi-governmental body responsible for setting, monitoring, and enforcing safety standards and practices across public transportation systems to protect passengers, workers, and the public.
-
D.
paratransit operator
A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
-
E.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b1a81588190b3f27a5483bb610e |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3:33 p.m.