Triple

T3715736
Position Surface form Disambiguated ID Type / Status
Subject Long Key State Park E81524 entity
Predicate hasAccess P273 FINISHED
Object U.S. Route 1 E543 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 1 | Statement: [Long Key State Park, hasAccess, U.S. Route 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 1
Context triple: [Long Key State Park, hasAccess, U.S. Route 1]
  • A. U.S. Route 1 chosen
    U.S. Route 1 is a major north–south United States highway running along the East Coast from Key West, Florida, to Fort Kent, Maine.
  • B. U.S. Route 401
    U.S. Route 401 is a U.S. highway running through North Carolina and South Carolina, connecting communities such as Fayetteville and Raleigh as part of the regional transportation network.
  • C. U.S. Route 1A
    U.S. Route 1A is an alternate alignment of U.S. Route 1 in Maine that serves local traffic and provides access to communities bypassed by the main highway.
  • D. U.S. Route 2
    U.S. Route 2 is a major east–west United States highway that runs across the northern part of the country, stretching from the Great Lakes region to northern New England.
  • E. U.S. Route 7
    U.S. Route 7 is a major north–south highway in New England that runs from Connecticut through Massachusetts to Vermont, connecting numerous towns and rural areas along its route.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1a81588190b3f27a5483bb610e completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69adc9cf77dc819098979094172d82d1 completed March 8, 2026, 7:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69b4e4e0abd08190895897c62a7a5243 completed March 14, 2026, 4:32 a.m.
Created at: March 8, 2026, 3:33 p.m.