Triple
T37105176
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Soviet deep-space communication network |
E918821
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ground-based spaceflight infrastructure |
C60837
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ground-based spaceflight infrastructure Context triple: [Soviet deep-space communication network, instanceOf, ground-based spaceflight infrastructure]
-
A.
ground segment infrastructure
chosen
Ground segment infrastructure comprises the terrestrial facilities, networks, and systems that support communication, control, data processing, and management of space-based assets.
-
B.
space launch facility
A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
-
C.
ground tracking facility
A ground tracking facility is a terrestrial station equipped with antennas, sensors, and communication systems used to monitor, communicate with, and control spacecraft or other remote vehicles.
-
D.
spaceflight center
A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
-
E.
space infrastructure project
A space infrastructure project is a large-scale, coordinated initiative to design, build, and operate physical and digital systems that enable sustained activities and services in space, such as communication, transportation, energy, and research.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e9b99c8819096164b21ff5bd996 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:14 p.m.