Triple
T37042970
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Skagit River delta |
E916829
|
entity |
| Predicate | partlyDikedSince |
P186933
|
FINISHED |
| Object | late 19th century |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: late 19th century | Statement: [Skagit River delta, partlyDikedSince, late 19th century]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: partlyDikedSince Context triple: [Skagit River delta, partlyDikedSince, late 19th century]
-
A.
partiallyInundatedSince
Indicates that an entity has been partially covered or flooded by water starting from a specific point in time and continuing thereafter.
-
B.
isUndammed
Indicates that a watercourse or river segment is free of dams or artificial barriers that obstruct its natural flow.
-
C.
DikeRepresents
Indicates that one entity (typically a person or organization) serves as the legal representative or advocate for another entity in matters concerning a dike or flood-defense structure.
-
D.
hasEmbankment
Indicates that one entity possesses or is characterized by an embankment, such as a raised structure built to contain, support, or protect against water or terrain.
-
E.
watercourseHasDam
Indicates that a watercourse (such as a river or stream) has a dam constructed on or across it.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e93ec4c8190be81cf87354d9155 |
completed | May 3, 2026, 3:49 p.m. |
| NER | Named-entity recognition | batch_69fb154c0fe08190a2e41e7a29b6055f |
completed | May 6, 2026, 10:17 a.m. |
| PD | Predicate disambiguation | batch_69f9fecc005c8190be082a8689193745 |
completed | May 5, 2026, 2:29 p.m. |
| PDg | Predicate description generation | batch_69fb154b5f8c819089103b41f51a1639 |
completed | May 6, 2026, 10:17 a.m. |
Created at: May 3, 2026, 4:14 p.m.