Triple

T37008399
Position Surface form Disambiguated ID Type / Status
Subject Navassa Island Light E915868 entity
Predicate operatorAtConstruction P62878 FINISHED
Object United States Lighthouse Service E12619 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: United States Lighthouse Service | Statement: [Navassa Island Light, operatorAtConstruction, United States Lighthouse Service]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatorAtConstruction
Context triple: [Navassa Island Light, operatorAtConstruction, United States Lighthouse Service]
  • A. operatorDuringConstruction chosen
    Indicates that an entity serves as the operator of another entity specifically during its construction phase.
  • B. operatorAtOpening
    Indicates that an operator is present and on duty at the time of an opening event.
  • C. operatorAtPeak
    Indicates that an operator is present and performing their role at the peak or highest point of a process, structure, or operational cycle.
  • D. operatorLater
    Indicates that one operator or operation occurs at a later time than another in a temporal ordering.
  • E. constructedDuring
    Indicates that one entity was built or created within the time period defined by another entity or event.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e90ed548190b187d2475f5c807d completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_6a01e3a2d0e08190a7d5622920dc56e6 completed May 11, 2026, 2:11 p.m.
NED1 Entity disambiguation (via context triple) batch_6a3e576ecbb8819088c982b3775b7524 completed June 26, 2026, 10:41 a.m.
PD Predicate disambiguation batch_6a01e3013e7881909f0cdca25a53c009 completed May 11, 2026, 2:09 p.m.
Created at: May 3, 2026, 4:14 p.m.