Triple

T37008399
Position Surface form Disambiguated ID Type / Status
Subject Navassa Island Light E915868 entity
Predicate operatorAtConstruction GENERATED
Object United States Lighthouse Service UNRECOGNIZED GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatorAtConstruction
Context triple: [Navassa Island Light, operatorAtConstruction, United States Lighthouse Service]
  • A. operatorDuringConstruction chosen
    Indicates that an entity serves as the operator of another entity specifically during its construction phase.
  • B. operatorAtOpening
    Indicates that an operator is present and on duty at the time of an opening event.
  • C. operatorAtPeak
    Indicates that an operator is present and performing their role at the peak or highest point of a process, structure, or operational cycle.
  • D. operatorLater
    Indicates that one operator or operation occurs at a later time than another in a temporal ordering.
  • E. constructedDuring
    Indicates that one entity was built or created within the time period defined by another entity or event.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e90ed548190b187d2475f5c807d completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.