Triple

T369779
Position Surface form Disambiguated ID Type / Status
Subject TransMilenio E8241 entity
Predicate designInfluencedBy P1994 FINISHED
Object Curitiba BRT system
The Curitiba BRT system is a pioneering bus rapid transit network in Curitiba, Brazil, renowned for its innovative, high-capacity, and cost-effective urban mass transit design that has influenced similar systems worldwide.
E46858 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Curitiba BRT system | Statement: [TransMilenio, designInfluencedBy, Curitiba BRT system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Curitiba BRT system
Context triple: [TransMilenio, designInfluencedBy, Curitiba BRT system]
  • A. TransMilenio bus rapid transit
    TransMilenio bus rapid transit is Bogotá’s high-capacity, bus-based mass transit system known for its dedicated lanes, large articulated buses, and station-based fare collection designed to improve urban mobility.
  • B. Guadalajara light rail system
    The Guadalajara light rail system is an urban rapid transit network serving Mexico’s Guadalajara metropolitan area, providing high-capacity rail service along key corridors of the city.
  • C. Cablebús
    Cablebús is an aerial cable car public transit system in Mexico City designed to provide efficient mass transportation, particularly to hilly and underserved areas.
  • D. Santiago Metro
    Santiago Metro is the rapid transit system serving Chile's capital, known as one of Latin America’s largest and most extensive urban rail networks.
  • E. MAX Light Rail
    MAX Light Rail is the metropolitan light rail transit system serving the Portland, Oregon, metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Curitiba BRT system
Triple: [TransMilenio, designInfluencedBy, Curitiba BRT system]
Generated description
The Curitiba BRT system is a pioneering bus rapid transit network in Curitiba, Brazil, renowned for its innovative, high-capacity, and cost-effective urban mass transit design that has influenced similar systems worldwide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Curitiba BRT system
Target entity description: The Curitiba BRT system is a pioneering bus rapid transit network in Curitiba, Brazil, renowned for its innovative, high-capacity, and cost-effective urban mass transit design that has influenced similar systems worldwide.
  • A. TransMilenio bus rapid transit
    TransMilenio bus rapid transit is Bogotá’s high-capacity, bus-based mass transit system known for its dedicated lanes, large articulated buses, and station-based fare collection designed to improve urban mobility.
  • B. Guadalajara light rail system
    The Guadalajara light rail system is an urban rapid transit network serving Mexico’s Guadalajara metropolitan area, providing high-capacity rail service along key corridors of the city.
  • C. Cablebús
    Cablebús is an aerial cable car public transit system in Mexico City designed to provide efficient mass transportation, particularly to hilly and underserved areas.
  • D. Santiago Metro
    Santiago Metro is the rapid transit system serving Chile's capital, known as one of Latin America’s largest and most extensive urban rail networks.
  • E. MAX Light Rail
    MAX Light Rail is the metropolitan light rail transit system serving the Portland, Oregon, metropolitan area.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: designInfluencedBy
Context triple: [TransMilenio, designInfluencedBy, Curitiba BRT system]
  • A. designedIn
    Indicates that something was created, planned, or conceived during a particular time period or at a specific location.
  • B. designedBy
    Indicates that one entity is the creator, planner, or architect responsible for the form or structure of another entity.
  • C. hasDesign
    Indicates that one entity possesses, embodies, or is characterized by a particular design associated with another entity.
  • D. influencedWork chosen
    Indicates that one work has had a significant impact on the creation, style, content, or development of another work.
  • E. designUse
    Indicates that one entity is used as a design basis, purpose, or intended functional use for another entity.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f2ec648190b42bc7db424f8109 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2ebfdb0608190b1794a871d0d237a completed Feb. 28, 2026, 1:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69a3ecac7e048190a76c02c738599c61 completed March 1, 2026, 7:37 a.m.
NEDg Description generation batch_69a3ed24dd888190bc333e764c228250 completed March 1, 2026, 7:39 a.m.
NED2 Entity disambiguation (via description) batch_69a3eeb57a9481908fe2b62805495b15 completed March 1, 2026, 7:45 a.m.
PD Predicate disambiguation batch_69a2e960d880819084b3df4e5137a1e2 completed Feb. 28, 2026, 1:10 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.