Triple
T3689658
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lough Mahon |
E78312
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tidal estuarine inlet |
C80
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tidal estuarine inlet Context triple: [Lough Mahon, instanceOf, tidal estuarine inlet]
-
A.
estuary
chosen
An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
-
B.
tidal creek
A tidal creek is a narrow, shallow waterway in coastal or estuarine areas whose flow and water level are strongly influenced by the rise and fall of the tides.
-
C.
coastal lake
A coastal lake is a body of water located near the sea, often partially separated from it by barriers such as sand dunes or barrier islands, and influenced by both freshwater inflows and marine processes.
-
D.
river
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
E.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85e285a081908f8cbfa9e2ed9b75 |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:26 p.m.