Triple

T368776
Position Surface form Disambiguated ID Type / Status
Subject Kure Naval Arsenal E8221 entity
Predicate instanceOf P0 FINISHED
Object military industrial facility C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military industrial facility
Context triple: [Kure Naval Arsenal, instanceOf, military industrial facility]
  • A. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • B. military fortification system
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • C. military organization
    A military organization is a structured group of armed forces personnel and resources, organized under a defined hierarchy and command system, to plan, coordinate, and conduct defense and combat operations in support of a state’s strategic objectives.
  • D. defense organization
    A defense organization is an entity, typically governmental or intergovernmental, responsible for planning, coordinating, and executing activities to protect a nation or group of nations from military and security threats.
  • E. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7f2ec648190b42bc7db424f8109 completed Feb. 28, 2026, 1:04 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.