Triple
T36869332
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cernavodă Nuclear Power Plant |
E911181
|
entity |
| Predicate | primaryElectricitySourceFor |
—
|
GENERATED |
| Object | Romania |
—
|
UNRECOGNIZED GENERATED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: primaryElectricitySourceFor Context triple: [Cernavodă Nuclear Power Plant, primaryElectricitySourceFor, Romania]
-
A.
isMajorSourceOfElectricityFor
chosen
Indicates that one entity provides the primary or dominant share of electrical power used by another entity.
-
B.
energyType
Indicates the kind or category of energy associated with an entity or process.
-
C.
countryEnergySystem
Indicates a relationship where a country is associated with, operates, or is characterized by a particular energy system.
-
D.
countryUsesElectricityFrom
Indicates that a country obtains and utilizes electrical power supplied from a specified source or provider.
-
E.
electrificationUsedFor
Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e80f6f0819091cba8e19b269615 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:13 p.m.