Triple
T36836396
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Steklov function |
E910283
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | smoothing operator |
C27224
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: smoothing operator Context triple: [Steklov function, instanceOf, smoothing operator]
-
A.
integral operator
chosen
An integral operator is a mapping that transforms a function into another function by integrating it against a given kernel over a specified domain.
-
B.
non-local operator
A non-local operator is a mathematical operator whose action at a point depends on the values of a function over an extended region or the entire domain, rather than solely on local information at that point.
-
C.
geometric operator
A geometric operator is a mathematical construct that acts on geometric objects (such as points, vectors, or shapes) to transform, relate, or measure them while respecting the underlying geometric structure.
-
D.
linear differential operator
A linear differential operator is a mapping that takes a function as input and returns a new function formed by a linear combination of the function and its derivatives.
-
E.
semigroup of operators
A semigroup of operators is a family of linear operators on a space, indexed by a semigroup (often time), such that the composition of operators matches the semigroup operation and typically includes an identity at the neutral element.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e7e9d60819092442fba73290a46 |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:13 p.m.