Triple
T36780978
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trans-Asian Railway |
E908768
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international rail transport initiative |
C48020
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international rail transport initiative Context triple: [Trans-Asian Railway, instanceOf, international rail transport initiative]
-
A.
international railway
An international railway is a rail transport system or route that connects and facilitates the movement of passengers and freight between two or more countries across their national borders.
-
B.
international transport project
chosen
An international transport project is a coordinated initiative that plans, finances, and implements cross-border transportation infrastructure or services to improve connectivity, efficiency, and economic integration between countries.
-
C.
private rail initiative
A private rail initiative is a privately funded and operated railway project or service designed to develop, expand, or improve rail infrastructure and operations outside of direct government control.
-
D.
intercity coach network
An intercity coach network is a coordinated system of long-distance bus routes, schedules, vehicles, and terminals that connects multiple cities to provide affordable, scheduled passenger transport.
-
E.
private railway
A private railway is a rail transport system owned and operated by a non-governmental entity, typically for exclusive use in serving specific industrial, commercial, or regional transportation needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e798aa08190ace31098d1b13e9f |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:12 p.m.