Triple

T36716511
Position Surface form Disambiguated ID Type / Status
Subject Low Level Bridge (former Fairmont Bridge site) E906926 entity
Predicate alsoKnownAs P39 FINISHED
Object Low-Level Bridge at former Fairmont Bridge site
The Low-Level Bridge at the former Fairmont Bridge site is a river crossing structure built to replace or succeed the earlier Fairmont Bridge at the same location.
E2195438 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Low-Level Bridge at former Fairmont Bridge site | Statement: [Low Level Bridge (former Fairmont Bridge site), alsoKnownAs, Low-Level Bridge at former Fairmont Bridge site]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Low-Level Bridge at former Fairmont Bridge site
Triple: [Low Level Bridge (former Fairmont Bridge site), alsoKnownAs, Low-Level Bridge at former Fairmont Bridge site]
Generated description
The Low-Level Bridge at the former Fairmont Bridge site is a river crossing structure built to replace or succeed the earlier Fairmont Bridge at the same location.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e73ad108190a5241585f2303e9a completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69f7c84073648190a516706dac88bb56 completed May 3, 2026, 10:12 p.m.
NED1 Entity disambiguation (via context triple) batch_6a3a383578748190b64fa169172c6a90 completed June 23, 2026, 7:39 a.m.
NEDg Description generation batch_6a3a3a60e61c8190b9b37c78ccd4e621 completed June 23, 2026, 7:48 a.m.
NED2 Entity disambiguation (via description) batch_6a3a3b2b51f48190ac30eafac3af8440 completed June 23, 2026, 7:52 a.m.
Created at: May 3, 2026, 4:12 p.m.