Triple

T3670435
Position Surface form Disambiguated ID Type / Status
Subject Darwin Correspondence Project E77864 entity
Predicate instanceOf P0 FINISHED
Object editorial project C2245 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: editorial project
Context triple: [Darwin Correspondence Project, instanceOf, editorial project]
  • A. editorial staff
    Editorial staff are the group of professionals responsible for planning, reviewing, refining, and managing written or multimedia content to ensure quality, accuracy, and alignment with an organization’s editorial standards.
  • B. editorial designation
    An editorial designation is a label or marker assigned by editors to categorize, qualify, or clarify the status, role, or treatment of content within a publication or document.
  • C. essay
    An essay is a structured piece of writing that presents a focused argument, analysis, or reflection on a specific topic, typically supported by evidence and organized into an introduction, body, and conclusion.
  • D. newspaper column
    A newspaper column is a recurring, authored piece in a newspaper that presents commentary, analysis, or personal perspective on specific topics or current events.
  • E. bibliographic project chosen
    A bibliographic project is an organized effort to collect, describe, and manage references to published or unpublished works around a specific topic, author, or field.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85e083008190b2e1b7085fe500bd completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:25 p.m.