Triple

T36686708
Position Surface form Disambiguated ID Type / Status
Subject Warsaw Metro Line M2 stations E905836 entity
Predicate instanceOf P0 FINISHED
Object metro station collection C64919 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metro station collection
Context triple: [Warsaw Metro Line M2 stations, instanceOf, metro station collection]
  • A. metro station entrance
    A metro station entrance is a designated access point at street level that allows passengers to enter or exit an underground or elevated metro system, typically featuring stairs, escalators, elevators, signage, and fare control access.
  • B. metro operator
    A metro operator is a person responsible for safely driving and controlling subway or metro trains according to schedules, signals, and operational procedures.
  • C. metro train
    A metro train is an electrically powered, multi-car rail vehicle designed to transport large numbers of passengers quickly and frequently along dedicated urban and suburban transit lines.
  • D. subway station artwork
    Subway station artwork is the collection of visual or multimedia installations integrated into station architecture to enhance the transit environment, reflect local culture, and improve passengers’ aesthetic experience.
  • E. MARC station
    A MARC station is a designated passenger rail stop along the Maryland Area Regional Commuter (MARC) train network, providing boarding, alighting, and related services for regional commuters.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e70d2448190bdd3ce781ba971c5 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:12 p.m.