Triple
T3660134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cyber-Planner |
E77627
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | central control system |
C13593
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: central control system Context triple: [Cyber-Planner, instanceOf, central control system]
-
A.
centralized monitoring center
A centralized monitoring center is a dedicated facility that aggregates, analyzes, and manages real-time data and alerts from distributed systems or locations to enable coordinated oversight and rapid response.
-
B.
train control system
A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
-
C.
attitude control computer
An attitude control computer is an onboard system that calculates and commands the necessary control actions to orient and stabilize a vehicle, such as a spacecraft or aircraft, in three-dimensional space.
-
D.
control line
A control line is a designated boundary or reference line used to guide, regulate, or constrain the behavior, position, or operation of a system, process, or object.
-
E.
center
A center is a conceptual class representing a focal point or core location around which other elements are organized, balanced, or oriented.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85dfc4dc8190a441864202ab2a7a |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:25 p.m.