Triple
T36573292
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BharatNet |
E902173
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | telecommunications infrastructure project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: telecommunications infrastructure project Context triple: [BharatNet, instanceOf, telecommunications infrastructure project]
-
A.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
telecommunications infrastructure component
A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
-
C.
telecommunications software project
A telecommunications software project is an organized effort to design, develop, integrate, and deploy software systems that enable, manage, or optimize electronic communication over networks such as telephone, mobile, and internet infrastructures.
-
D.
telecommunications initiative
A telecommunications initiative is a coordinated project or program aimed at developing, expanding, or improving communication networks and services to enhance connectivity and information exchange.
-
E.
telecommunications network
A telecommunications network is a system of interconnected nodes, transmission media, and protocols that enables the exchange of voice, data, and multimedia information between users and devices over distance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6416708190a9754b8c52d4e453 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:11 p.m.