Triple
T3652909
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | India–Pakistan Line of Control |
E77462
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military demarcation line |
C1361
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military demarcation line Context triple: [India–Pakistan Line of Control, instanceOf, military demarcation line]
-
A.
land border
A land border is a defined line on the Earth's surface that separates the territories of two adjacent states or regions across contiguous land.
-
B.
political boundary
chosen
A political boundary is an officially recognized dividing line that separates the geographic areas of different political entities, such as countries, states, or municipalities, defining the limits of their jurisdiction and authority.
-
C.
line of fortifications
A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
-
D.
border conflict
A border conflict is a dispute between neighboring states or groups over the ownership, control, or demarcation of a shared territorial boundary.
-
E.
geographical boundary
A geographical boundary is a defined line or zone on the Earth's surface that separates distinct political, cultural, or natural regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85def5cc8190863dccf55a18bebb |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:24 p.m.