Triple

T36515219
Position Surface form Disambiguated ID Type / Status
Subject Lexington-class battlecruiser E900016 entity
Predicate plannedShip P193804 FINISHED
Object USS Saratoga (CC-3)
USS Saratoga (CC-3) was a planned early 20th-century U.S. Navy battlecruiser of the Lexington class that was laid down but ultimately canceled and scrapped before completion under the terms of the Washington Naval Treaty.
E2189014 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: USS Saratoga (CC-3) | Statement: [Lexington-class battlecruiser, plannedShip, USS Saratoga (CC-3)]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: USS Saratoga (CC-3)
Triple: [Lexington-class battlecruiser, plannedShip, USS Saratoga (CC-3)]
Generated description
USS Saratoga (CC-3) was a planned early 20th-century U.S. Navy battlecruiser of the Lexington class that was laid down but ultimately canceled and scrapped before completion under the terms of the Washington Naval Treaty.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5dada881909da2d34bc7a9202a completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69fd55efc3788190ac0a1e530d347e4f completed May 8, 2026, 3:18 a.m.
NED1 Entity disambiguation (via context triple) batch_6a39e6d8c20c819091a37b370f1484e7 completed June 23, 2026, 1:52 a.m.
NEDg Description generation batch_6a39e781b60881908c02a333187588f9 completed June 23, 2026, 1:55 a.m.
NED2 Entity disambiguation (via description) batch_6a39ebb78b44819084252f4b2cefe4e6 completed June 23, 2026, 2:13 a.m.
Created at: May 3, 2026, 4:10 p.m.