Triple

T36500795
Position Surface form Disambiguated ID Type / Status
Subject Waterloo Bridge E899320 entity
Predicate instanceOf P0 FINISHED
Object reinforced concrete bridge C9757 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reinforced concrete bridge
Context triple: [Waterloo Bridge, instanceOf, reinforced concrete bridge]
  • A. reinforced-concrete bridge
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
  • B. reinforced-concrete bridge chosen
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely span obstacles and carry traffic loads over a defined distance.
  • C. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
  • D. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
  • E. steel and concrete bridge
    A steel and concrete bridge is a structural system that uses steel components for tensile and flexural strength combined with concrete elements for compressive resistance and durability to span physical obstacles such as roads, rivers, or valleys.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e5b92088190933afda3f7531dd4 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.