Triple
T36454479
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | T train (planned) |
E898112
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | proposed New York City Subway service |
C12143
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: proposed New York City Subway service Context triple: [T train (planned), instanceOf, proposed New York City Subway service]
-
A.
New York City Subway service designation
chosen
A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
-
B.
New York City Subway infrastructure project
A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
-
C.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
D.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
E.
era of New York City transit
An era of New York City transit represents a distinct historical period characterized by specific technologies, infrastructure, policies, and social conditions that shape how people move through the city.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e57f08481908593bd0bc34581c8 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:10 p.m.