Triple

T36454479
Position Surface form Disambiguated ID Type / Status
Subject T train (planned) E898112 entity
Predicate instanceOf P0 FINISHED
Object proposed New York City Subway service C12143 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proposed New York City Subway service
Context triple: [T train (planned), instanceOf, proposed New York City Subway service]
  • A. New York City Subway service designation chosen
    A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
  • B. New York City Subway infrastructure project
    A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
  • C. New York City Subway–railroad interchange
    A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
  • D. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • E. era of New York City transit
    An era of New York City transit represents a distinct historical period characterized by specific technologies, infrastructure, policies, and social conditions that shape how people move through the city.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e57f08481908593bd0bc34581c8 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.