Triple

T36414694
Position Surface form Disambiguated ID Type / Status
Subject Lee Conservancy E896973 entity
Predicate instanceOf P0 FINISHED
Object navigation authority jurisdiction C64057 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: navigation authority jurisdiction
Context triple: [Lee Conservancy, instanceOf, navigation authority jurisdiction]
  • A. Navigation infrastructure
    Navigation infrastructure encompasses the physical and digital systems, structures, and services that enable the accurate, efficient, and safe movement of people, vehicles, and information through space.
  • B. traffic authority
    A traffic authority is an organization or governmental body responsible for planning, regulating, and managing road use, traffic flow, and transportation safety within a specific jurisdiction.
  • C. navigation infrastructure vicinity
    Navigation infrastructure vicinity is the spatial region surrounding navigational aids or facilities (such as beacons, buoys, or control towers) within which their presence, signals, or operational constraints are relevant to route planning and movement.
  • D. navigation system
    A navigation system is a coordinated set of hardware and software components that determines a user's position and provides optimal routes and guidance to reach desired destinations.
  • E. navigation area
    A navigation area is a defined region within an environment that supports and constrains movement, pathfinding, and route planning for agents or users.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e54ce408190849acc3f7758937c completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.