Triple

T3640864
Position Surface form Disambiguated ID Type / Status
Subject M42 motorway E77183 entity
Predicate connectsTo P845 FINISHED
Object M6 Toll E328749 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M6 Toll | Statement: [M42 motorway, connectsTo, M6 Toll]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M6 Toll
Context triple: [M42 motorway, connectsTo, M6 Toll]
  • A. M6 Toll chosen
    The M6 Toll is a major privately operated motorway in England that serves as a congestion-relief bypass for a busy stretch of the M6 near Birmingham.
  • B. M5 motorway
    The M5 motorway is a major north–south route in England that runs from the West Midlands near Birmingham down through the West Country to Exeter, serving as a key link between the Midlands and southwest England.
  • C. M4 motorway
    The M4 motorway is a major west–east route in the United Kingdom linking London with South Wales via key cities such as Reading, Swindon, Bristol and Newport.
  • D. M6 motorway
    The M6 motorway is a major north–south route in England, running from the Midlands to the Scottish border and serving as a key part of the UK’s strategic road network.
  • E. M3 motorway
    The M3 motorway is a major road in southern England that connects London to Southampton, passing through counties including Surrey and Hampshire.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85dd0be48190b738990cb20c4731 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adc357c3308190bd8801d68244a53e completed March 8, 2026, 6:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69b44f2a8a5c8190b84dcf4b4b8a939e completed March 13, 2026, 5:53 p.m.
Created at: March 8, 2026, 3:24 p.m.