Triple

T36387429
Position Surface form Disambiguated ID Type / Status
Subject Chilpancingo–Acapulco toll segment E896233 entity
Predicate instanceOf P0 FINISHED
Object controlled-access highway segment C1129 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: controlled-access highway segment
Context triple: [Chilpancingo–Acapulco toll segment, instanceOf, controlled-access highway segment]
  • A. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • B. highway segment chosen
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • C. road segment
    A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
  • D. elevated expressway
    An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
  • E. high-occupancy toll lanes
    High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e52e3108190becf70b090ae7bd6 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:10 p.m.