Triple

T36345545
Position Surface form Disambiguated ID Type / Status
Subject Адмиралтейство E895053 entity
Predicate instanceOf P0 FINISHED
Object верфь C13842 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: верфь
Context triple: [Адмиралтейство, instanceOf, верфь]
  • A. shipbuilding facility chosen
    A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
  • B. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • C. shipbuilder
    A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
  • D. seafarer
    A seafarer is a person who works or travels regularly by sea, operating, navigating, or serving aboard marine vessels.
  • E. concrete ship
    A concrete ship is a seafaring vessel whose hull is constructed from reinforced concrete instead of traditional materials like steel or wood.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e4f437c8190a1af3ea2564f41f5 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:09 p.m.