Triple

T3633026
Position Surface form Disambiguated ID Type / Status
Subject Wood–Anderson torsion seismometer E77001 entity
Predicate instanceOf P0 FINISHED
Object torsion seismometer C13527 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: torsion seismometer
Context triple: [Wood–Anderson torsion seismometer, instanceOf, torsion seismometer]
  • A. seismological research institute
    A seismological research institute is an organization dedicated to studying earthquakes and Earth's internal structure through seismic data collection, analysis, and modeling to improve hazard assessment and scientific understanding.
  • B. tunnel boring machine
    A tunnel boring machine is a large, specialized mechanical device used to excavate tunnels through soil and rock by cutting, removing, and transporting material while simultaneously supporting the tunnel face.
  • C. earthquake monitoring center
    An earthquake monitoring center is a facility that continuously collects, analyzes, and disseminates seismic data to detect earthquakes, assess their impact, and support early warning and emergency response efforts.
  • D. seismic magnitude scale
    A seismic magnitude scale is a logarithmic measure used to quantify the size or energy release of an earthquake based on recorded ground motion.
  • E. astronomical instrument
    An astronomical instrument is a specialized device or tool designed to observe, measure, or analyze celestial objects and phenomena.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85dd0be48190b738990cb20c4731 completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:23 p.m.