Triple

T36313067
Position Surface form Disambiguated ID Type / Status
Subject Hyderabad–Warangal industrial corridor E894113 entity
Predicate instanceOf P0 FINISHED
Object planned economic development zone C5755 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned economic development zone
Context triple: [Hyderabad–Warangal industrial corridor, instanceOf, planned economic development zone]
  • A. economic and technological development zone chosen
    An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
  • B. regional economic zone
    A regional economic zone is a geographically defined area within or across countries where economic policies, regulations, and incentives are coordinated to promote trade, investment, and development.
  • C. infrastructure development zone
    An infrastructure development zone is a designated geographic area prioritized for the planning, investment, and construction of essential public facilities and services—such as transportation, utilities, and communications—to support economic growth and urban or regional development.
  • D. special economic zone
    A special economic zone is a designated geographic area within a country where business and trade laws differ from the rest of the nation to attract investment, boost exports, and stimulate economic growth.
  • E. planned development
    A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e4c1b248190b10667d0213537fe completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:09 p.m.